21 October 2025,  
 
Screen Reader Access Skip to main content Skip to navigation Feedback/Grievance Text Size
 

 

Hanol-Tuini

Quick Navigation

Back

 Salient Features
 

Barrage
River Tons
Location Hanol
Length 72 m
Power Tunnel
Length 6.0 km.
Power House
Location Tuini
Head 103 m
Installed Capacity 26 MW


The scheme envisages construction of a 72 m. long barrage on river tons near village Hanol in Distt. Dehradun to divert 36 cumecs water through 3.5 m. diameter and 6.0 km. long tunnel to a surface power house of 26.0 MW. installed capacity. Power generation on 90% availability shall be 120.03 x 10 6 KWh.

 
 
CONTACT US

Uttarakhand Irrigation Department
Engineer In Chief
Yamuna Colony
Dehradun 248001

Phone No : 0135-2530170, 2530916 (Off.)
Email : hodcamp.id@gmail.com 
 
 

Powered By : Webline