28 April 2026,  
 
Screen Reader Access Skip to main content Skip to navigation Feedback/Grievance Text Size
 

 

Tube-well Laboratory

Quick Navigation

Handles two types of investigations, increasing the yield of a well by proper design of gravel packs and calibration of V-notch for measurement of water supplied from tube-wells. The V-notch calibration study was necessitated because the steel edges of V-notch get rusted with time and need calibration. The guide lines for the design and construction of gravel packed wells suggested by the Institute were accepted by the Central Board of Irrigation and Power and were later published as a C.B.I. & P. memorandum.

 
 
CONTACT US

Uttarakhand Irrigation Department
Engineer In Chief
Yamuna Colony
Dehradun 248001

Phone No : 0135-2530170, 2530916 (Off.)
Email : hodcamp.id@gmail.com 
 
 

Powered By : Webline