21 October 2025,  
 
Screen Reader Access Skip to main content Skip to navigation Feedback/Grievance Text Size
 

 

Tuini-Plasu

Quick Navigation

Back

Salient Features

Barrage
River Tons
Location Tuini
Length 85.5 m
Power Tunnel
Length 8.5 km.
Design Discharge 78 Cumecs.
Power House
Location Plasu
Head 95m
Installed Capacity 72 MW
No. of units 3


It is a run of the river scheme. A barrage located 125 km. upstream of Kalsi near village Tiuni would divert 78 cumecs water in head race tunnel to utilize a drop of 95 m available in river tones between Tiuni and Plasu.

Catchment area is 3320 sq.km. Water shall be diverted through 8.5 km long tunnel of 5.0 dia to a surface power house of 72 MW. installed capacity. Power generation on 90% availability shall be 250 x 106 KWH.

 
 
CONTACT US

Uttarakhand Irrigation Department
Engineer In Chief
Yamuna Colony
Dehradun 248001

Phone No : 0135-2530170, 2530916 (Off.)
Email : hodcamp.id@gmail.com 
 
 

Powered By : Webline