|
Back
Salient Features
| Barrage |
| River |
Tons |
| Location |
Tuini |
| Length |
85.5 m |
| Power Tunnel |
| Length |
8.5 km. |
| Design Discharge |
78 Cumecs. |
| Power House |
| Location |
Plasu |
| Head |
95m |
| Installed Capacity |
72 MW |
| No. of units |
3 |
It is a run of the river scheme. A barrage located 125 km. upstream of Kalsi near village Tiuni would divert 78 cumecs water in head race tunnel to utilize a drop of 95 m available in river tones between Tiuni and Plasu.
Catchment area is 3320 sq.km. Water shall be diverted through 8.5 km long tunnel of 5.0 dia to a surface power house of 72 MW. installed capacity. Power generation on 90% availability shall be 250 x 106 KWH.
|